首页> 外文期刊>Nuclear Engineering International >Swiss decommissioning costs rise to $22.5 billion
【24h】

Swiss decommissioning costs rise to $22.5 billion

机译:瑞士退役成本上升至225亿美元

获取原文
获取原文并翻译 | 示例
           

摘要

The bill for decommissioning and radioactive waste disposal at Switzerland's five nuclear power plants is estimated at CHF 20.65 billion ($22.46 billion). This reflects a 10% increase since the last estimate in 2006, according to figures from the Swiss Federal Energy Office (SFOE). Swiss decommissioning cost estimates are updated every five years to reflect the state of current knowledge and technological developments. The recent estimate has been prepared by swissnuclear, a technical section of the Swiss electricity suppliers' organization, swisselectric. It splits the cost into three phases: post-operation, plant decommissioning and radwaste management. Costs for a five-year post-operational phase immediately after a plant is closed are estimated at CHF 1.71 billion ($1.86 billion), up 2% on the 2006 estimate.
机译:瑞士五个核电厂的退役和放射性废物处置费用估计为206.5亿瑞士法郎(224.6亿美元)。根据瑞士联邦能源局(SFOE)的数据,这比2006年的最新估计增加了10%。瑞士退役成本估算每五年更新一次,以反映当前知识和技术发展的状况。瑞士电商组织swisselectric的技术部门swissnuclear编制了最新估算。它将成本分为三个阶段:运营后,工厂退役和垃圾废物管理。一家工厂关闭后的五年运营后阶段的成本估计为17.1亿瑞士法郎(18.6亿美元),比2006年的估算增加了2%。

著录项

  • 来源
    《Nuclear Engineering International》 |2012年第690期|p.6|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号