Slurry of activity

机译:浆液

获取原文
获取原文并翻译 | 示例
       

摘要

At the site of the Cigar Lake uranium mine in Canada's uranium-rich Athabasca Basin, around 660 km north of Saskatoon, work is continuing on a revised schedule set in 2009, after flooding of the underground workings in 2006. Following the receipt of an eight-year operating licence from the Canadian Nuclear Safety Commission (CNSC) in June, operator Cameco expects mining to begin any day now. The second of four jet boring systems, which will use high-pressure water jets to carve out cavities in the orebody, throughout the life of the mine, has been delivered to the site and assembled underground. Work is also progressing well at surface facilities (which include the ore slurry load-out building, maintenance facility and freeze plant), as well as on the underground infrastructure (see figure 2) needed for mining to begin.
机译:在加拿大富铀的阿萨巴斯卡盆地雪茄湖铀矿的所在地,萨斯卡通以北约660公里,在2006年地下工程被洪水淹没之后,2009年的工作仍按修订后的时间表进行。在收到八口井之后,运营商Cameco于6月获得了加拿大核安全委员会(CNSC)的为期一年的运营许可证,预计现在任何一天都可以开始开采。在整个矿山的整个生命周期中,四个喷射钻孔系统中的第二个将使用高压水射流在矿体中挖出空洞,该系统已交付现场并在地下组装。在开始开采所需的地面设施(包括矿浆卸载建筑物,维护设施和冷冻厂)以及地下基础设施(见图2)上的工作也进展顺利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号