Replacement of the feedwater piping system in the reactor building outside the containment at Philippsburg I nuclear power station

机译:更换菲利普斯堡一世核电站安全壳外的反应堆厂房中的给水管道系统

获取原文
获取原文并翻译 | 示例
           

摘要

At Philippsburg/Nuclear Power Station the replacement of the feedwater lines (WB35) from their point of entry into the reactor building up to the first external isolation valve of each line brought the quality level of the whole of the feedwater pipe system in the reactor building with basic safety requirements. The design of the new piping was based on a state-of the-art concept in the mechanical and fluid-dynamics behavior. The extensive analyses focused on the optimization of the closing behavior of the third damped check valves and the integrity analysis of the RPV nozzle. The integrity analysis was performed on the basis of a postulated reliably detectable defect, using the plastic limit load method with the specified yield strength as yield stress. The planning period for preparation of the licensing and approval documents lasted approximately 30 months, following a preliminary concept phase. Replacement was performed in 43 days.
机译:在菲利普斯堡/核电站,从进水口到反应堆的更换到每条管道的第一个外部隔离阀的更换,给水管路(WB35)的更换使反应堆厂房中整个给水管道系统的质量达到了最高水平具有基本的安全要求。新管道的设计基于机械和流体动力学行为方面的最新概念。广泛的分析集中在优化第三阻尼止回阀的关闭行为以及RPV喷嘴的完整性分析上。完整性分析是在假定的可靠可检测缺陷的基础上进行的,使用塑性极限载荷法以指定的屈服强度作为屈服应力。在初步构思阶段之后,准备许可和批准文件的计划期持续了大约30个月。更换在43天内完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号