...
首页> 外文期刊>Nuclear future >Design for Decommisioning: A New Beginning
【24h】

Design for Decommisioning: A New Beginning

机译:退役设计:新的开始

获取原文
获取原文并翻译 | 示例
           

摘要

As I said at the beginning, designing nuclear facilities to achieve their immediate operational objectives is challenging enough, so it is not difficult to understand why DfD has languished down the queue when it comes to setting priorities. Added to that, I doubt that in the early days of the industry anyone could have foreseen how desperately complicated, time-consuming and costly it would be to take nuclear facilities apart. These days though, we have plentiful examples of what can happen when DfD doesn't get invited to the top table, ali of which should drive our determination to do things very differently from now on.
机译:正如我在开始时说的那样,设计核设施以实现其近期的运行目标已经具有足够的挑战性,因此不难理解为什么国防部在确定优先事项时会排长队。除此之外,我怀疑在该行业的初期,谁能预见到将核设施拆散是多么极端的复杂,耗时和昂贵。但是,这些天来,我们有很多例子说明了当DfD不被邀请进入榜首时会发生什么,所有这些都将促使我们下定决心,从现在开始做事截然不同。

著录项

  • 来源
    《Nuclear future》 |2010年第6期|p.326-332|共7页
  • 作者

    Bill Collum;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号