首页> 外文期刊>The New Zealand Railway Observer >Hokitika to Westport Feasability Study Report
【24h】

Hokitika to Westport Feasability Study Report

机译:Hokitika到Westport可行性学习报告

获取原文
获取原文并翻译 | 示例
           

摘要

On 7 April it was announced that the proposed tourist train between Hokitika and Westport would not go ahead as KiwiRail had concluded that an investment of $91 million for the project was not justified. Was it a case of what the politicians thought desirable was at odds with KiwiRail management's thinking?
机译:4月7日,宣布,由于KiWirail的结论是,KiWiRail的拟议旅游火车不会继续,因为这项项目的投资为9100万美元并非合理。这是一个案例,政治家所认为是什么是与kiwirail管理层的思想有所了解?

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号