...
首页> 外文期刊>New civil engineer >Structures Aecom wins swimming pool design competition
【24h】

Structures Aecom wins swimming pool design competition

机译:结构Aecom赢得游泳池设计竞赛

获取原文
获取原文并翻译 | 示例
           

摘要

Consultant Aecom and Wilkinson Eyre Architects have won the RIBA-organised competition to design a new landmark swimming pool in Worthing. The new building will formrnpart of Worthing Borough Council's masterplan for the town's seafront, and will include an eight lane, 25m long pool, a combined learner/diving pool, indoor leisure pools, with rapids, flumes, and outdoor waters, a health and fitness centre, cafe, creche and flexible space for other activities. The building is aiming for a high sustainability rating, incor-rnporating advanced technologies for construction, energy management and recycling.rnMeasures include optimising the facade design to maximise use of natural daylight and passive thermal benefit in winter, and incorporating photovoltaic arrays to generate electricity. Ground source heat pumps will warm the building.
机译:顾问Aecom和Wilkinson Eyre Architects在RIBA组织的竞赛中赢得了在沃辛设计新地标游泳池的竞赛。新建筑将成为沃辛自治市镇城镇总体规划的一部分,包括一个八车道,25m长的游泳池,一个组合的学习/潜水游泳池,室内休闲游泳池,急流,水槽和室外水域,健康与健身中心,咖啡厅,托儿所和其他活动场所。该建筑的目标是实现高可持续性等级,并采用先进的建筑,能源管理和回收技术。措施包括优化立面设计,以在冬季最大程度地利用自然采光和被动热能,并结合光伏阵列发电。地源热泵将使建筑物变暖。

著录项

  • 来源
    《New civil engineer》 |2009年第10期|12-12|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号