...
首页> 外文期刊>New civil engineer >Network Rail to defer some projects
【24h】

Network Rail to defer some projects

机译:网络铁路推迟一些项目

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Network Rail bosses are deciding which projects could be pushed back if the government orders the rail operator to cut its spending. Board minutes from October, which have just been made public, show that Network Rail bosses discussed several "scenarios [...] to mitigate the effects of Covid-19" after recording a £96M combined overspend and revenue shortfall. Consequently, Network Rail has begun preparing a revised business plan, which includes cost savings, should government reduce its budget. "Should Network Rail be asked to cut cost from its business plan, the revised plan would split cost savings between deferrals and reduced output," the minutes state. 'The board discussed whether the changes to technical standards was delivering efficiencies and noted that these were starting to be ascertained and would be reported in due course.
机译:网络轨道老板决定如果政府订购铁路运营商以降低其支出,则可以将哪些项目推回去。刚刚公开的10月份的董事会分钟显示,网络铁路老板讨论了几个“情景”,以减轻Covid-19的影响,录制96米的汇总超支和收入短缺。因此,如果政府减少预算,则网络轨道已开始准备修订的商业计划,其中包括节省成本。 “应要求网络铁路从业务计划中削减成本,修订后的计划将在推迟和减少产出之间分配成本节省,”分钟状态“。 “委员会讨论了技术标准的变化是否正在提供效率,并指出这些是开始确定的,并将在适当的时候报告。

著录项

  • 来源
    《New civil engineer》 |2021年第2期|13-13|共1页
  • 作者

    ROB HORGAN;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号