...
【24h】

PROP TO DROP

机译:拨动

获取原文
获取原文并翻译 | 示例
           

摘要

However grand the scale of a project, successful delivery always comes down to fine details. In West London, at one of 24 sites serving the London's 25km Thames Tideway Tunnel project, a complex excavation job required special attention from engineers. Tideway Tunnel will run from Acton in the west of London to Abbey Mills in the east. It will mostly run underneath the tidal section of the river Thames and will collect, store and convey to treatment works downstream almost all of the raw sewage and rainwater that currently overflows into the river. The Ferrovial and Laing O'Rourke (FLO) joint venture is delivering the S746M central section of the super sewer between Carnwath Road in Fulham and Chambers Wharf in Southwark.
机译:然而,项目的规模较大,成功的交货总是归结为细节。在伦敦西伦敦,在伦敦25公里的泰德威隧道项目的24个站点之一,复杂的挖掘工作需要专门的工程师。潮汐隧道将从伦敦西部的Acton到东部的Abbey Mills奔跑。它主要在泰晤士河的潮汐部分下面运行,并将收集,储存和传达到治疗工程,下游几乎所有的原始污水和雨水,目前溢出到河流中。 Ferrovial和Laing O'Rourke(FLO)合资企业正在富勒姆的Carnwath路和SouthWark的Carnwath Road之间提供S746M中央部分。

著录项

  • 来源
    《New civil engineer》 |2021年第2期|4244|共2页
  • 作者

    Greg Pitcher;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号