首页> 外文期刊>Naval Research Logistics >Minimizing the Makespan in Open-Shop Scheduling Problems with a Convex Resource Consumption Function
【24h】

Minimizing the Makespan in Open-Shop Scheduling Problems with a Convex Resource Consumption Function

机译:具有凸资源消耗函数的开店调度问题中的makespan最小化

获取原文
获取原文并翻译 | 示例
           

摘要

We consider open-shop scheduling problems where operation-processing times are a convex decreasing function of a common limited nonrenewable resource. The scheduler's objective is to determine the optimal job sequence on each machine and the optimal resource allocation for each operation in order to minimize the makespan. We prove that this problem is NP-hard, but for the special case of the two-machine problem we provide an efficient optimization algorithm. We also provide a fully polynomial approximation scheme for solving the preemptive case.
机译:我们考虑开店调度问题,其中操作处理时间是常见的有限不可再生资源的凸递减函数。调度程序的目标是确定每台机器上的最佳作业顺序以及每个操作的最佳资源分配,以最大程度地缩短工期。我们证明了该问题是NP问题,但是对于两机问题的特殊情况,我们提供了一种有效的优化算法。我们还提供了一种完全多项式逼近方案来解决先占情况。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号