...
首页> 外文期刊>Modern Railways >On train OHLE inspection
【24h】

On train OHLE inspection

机译:火车上OHLE检查

获取原文
获取原文并翻译 | 示例
           

摘要

Following the brou-ha-ha with faulty sections of catenary exposed by the Virgin High Frequency timetable, Virgin Trains has fitted two Pendolinos with instrumented pantographs. These measure the force and acceleration at the pantograph head along the direction of travel. A GPS unit provides location.rnInitially, two warning levels have been set: amber for 10-20g (g= acceleration due to gravity) and red for accelerations over 20g. A 20g acceleration is quite a shock. Each alert and its location is recorded by the Train Management System and sent back to the Train Care control centre.rnIn essence, Alstom and Virgin are finding out more about their trains' interfaces with Network Rail's infrastructure and the data will be available to Network Rail to assist maintenance planning. Otherwise Network Rail has to rely on its Mentor OHLE inspection coach which has to cover the whole electrified network and doesn't run at 125mph.
机译:在维珍高频时刻表暴露出接触网有故障的部分之后,维珍列车为两名潘多利诺人安装了受电弓。它们测量受电弓沿行进方向的力和加速度。 GPS单元可提供位置信息。最初,已设置了两个警告级别:10至20克为琥珀色(g =因重力而加速),加速度为20克以上为红色。 20g的加速度实在令人震惊。火车管理系统会记录每个警报及其位置,然后将其发送回火车管理控制中心。本质上,阿尔斯通和维珍航空正在寻找有关火车与Network Rail基础设施的接口的更多信息,数据将可供Network Rail使用协助维护计划。否则,Network Rail必须依靠其Mentor OHLE检查教练,该教练必须覆盖整个电气网络,并且不能以125英里/小时的速度运行。

著录项

  • 来源
    《Modern Railways》 |2010年第742期|P.23|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号