...
首页> 外文期刊>The MJ >Halted ice rink project gets extra £550,000
【24h】

Halted ice rink project gets extra £550,000

机译:停止的溜冰场项目获得额外的550,000英镑

获取原文
获取原文并翻译 | 示例
           

摘要

An extra £550,000 has been invested in a permanent ice rink by South Cambridgeshire DC after buried explosives were discovered during construction.The council had already agreed in September 2016 to provide a £1.85m loan to Cambridge Leisure and Ice Centre (CLIC) for the new venue, which is being built on the edge of Cambridge.Building work on the site, which is being leased by Marshall of Cambridge to CLIC, began a year ago but was halted following the discovery of 194 World War II grenades, increasing the cost of the project.
机译:在建造过程中发现埋藏的炸药后,南剑桥郡DC在永久性溜冰场上追加投资了55万英镑.2016年9月,市议会已同意向剑桥休闲和冰中心(CLIC)提供185万英镑的贷款,用于该项目的建设。剑桥的马歇尔(Marshall)租借给CLIC的场地建设工作始于一年前,但由于发现了194次第二次世界大战手榴弹而中止,增加了成本该项目。

著录项

  • 来源
    《The MJ》 |2018年第6期|7-7|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号