...
首页> 外文期刊>Platts Metals Week >Goldcorp receives approval for morro
【24h】

Goldcorp receives approval for morro

机译:Goldcorp获得morro的批准

获取原文
获取原文并翻译 | 示例
           

摘要

The nEnvironment Evaluation Commission for the northern Chilean nregion of Atacama has approved plans by Goldcorp to develop nits El Morro copper-gold project, the company said. The nCanadian firm plans to spend $2.5 billion to develop the nmine, which will have capacity to process 90,000 mt/day of nore and produce 2,000 mt/day of copper-gold concentrate. A nstudy completed by previous owner Xstrata Copper estimated nproduction at 195,285 mt/year of copper and 353,774 ozyear of gold during its five years. The reserves at El Morro, 30% nowned by New Gold, total 450 million mt, with a cut-off grade nof 0.58% and 0.47 grams of gold/mt. Production is scheduled nto begin in 2015. In addition to the mine and concentrator, nthe company has committed to building a desalination plant to nsupply water to the mine without affecting local water supplies. nThe company will also build a new access road to the project nto reduce the impact on local farming communities and use nthickened tailings technology to reduce water use. The project nis expected to create 5,500 jobs during the construction phase nand 2,000 jobs during its operation
机译:该公司表示,智利北部阿塔卡马北部地区的n环境评估委员会已经批准了Goldcorp的开发尼特埃尔莫罗铜金矿项目的计划。这家加拿大nC公司计划投资25亿美元开发亚胺,该亚胺的产能为每天处理90,000公吨矿石,每天生产2,000公吨铜金精矿。前所有者Xstrata Copper完成的一项研究估计,在过去五年中,铜的年产量为195,285公吨/年,黄金的年产量为353,774盎司/年。 El Morro的储量为4.5亿吨,其中新黄金增加了30%的储量,最低品位为0.58%,金的储量为0.47克/吨。该工厂计划于2015年开始生产。除矿山和选矿厂外,该公司还承诺建造一个海水淡化厂,向矿山供水,而不会影响当地的供水。 n该公司还将为该项目修建一条新的通行道路,以减少对当地农业社区的影响,并使用强化的尾矿技术来减少用水。该项目预计将在建设阶段创造5500个工作岗位,并在运营期间创造2,000个工作岗位。

著录项

  • 来源
    《Platts Metals Week》 |2011年第52期|p.13|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号