首页> 外文期刊>Mathematical Problems in Engineering >Integrated Production-Delivery Lot Sizing Model with Limited Production Capacity and Transportation Cost considering Overtime Work and Maintenance Time
【24h】

Integrated Production-Delivery Lot Sizing Model with Limited Production Capacity and Transportation Cost considering Overtime Work and Maintenance Time

机译:考虑到加班工作和维护时间的,具有有限的生产能力和运输成本的集成生产-交付批量模型

获取原文
获取原文并翻译 | 示例
       

摘要

An extension of the integrated production-delivery lot sizing model with limited production capacity and transportation cost is investigated. We introduce the factor of overtime work into the model to improve the manufacturer's production. In addition, when finishing a lot, the manufacturer has maintenance time to maintain and repair equipment for ensuring that the supply chain is operating continuously. By analyzing the integrated model, the solution procedure is provided to determine the optimal delivery and order policy. We conduct a numerical experiment and give sensitive analysis by varying some parameters to illustrate the problem and its solution procedure.
机译:研究了在生产能力和运输成本有限的情况下,集成的生产-交付批量计算模型的扩展。我们将加班工作的因素引入模型中,以改善制造商的生产。此外,在进行大量精加工时,制造商有维护时间来维护和维修设备,以确保供应链持续运行。通过分析集成模型,提供了解决过程,以确定最佳的交货和订购策略。我们进行了数值实验,并通过更改一些参数来进行敏感分析,以说明问题及其解决步骤。

著录项

  • 来源
    《Mathematical Problems in Engineering》 |2018年第4期|1569029.1-1569029.10|共10页
  • 作者

    Zhang Renqian; Sun Xuefang;

  • 作者单位

    Beihang Univ, Sch Econ & Management, Beijing 100191, Peoples R China;

    Beihang Univ, Sch Econ & Management, Beijing 100191, Peoples R China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 13:52:09

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号