...
首页> 外文期刊>Maritime by Holland magazine >Van Oord wins contract from Klaipeda port authority
【24h】

Van Oord wins contract from Klaipeda port authority

机译:范·奥德(Van Oord)从克莱佩达港务局赢得合同

获取原文
获取原文并翻译 | 示例
           

摘要

The Lithuanian port authority of Klapeida has signed a contract with Van Oord for deepening and widening the access channel to the port. This is Van Oord's first assignment in this Baltic state. The contract involves the deepening of the access channel to -14.5 metres along a stretch of almost six kilometres. The channel will also be widened by 30 metres from 120 to 150 metres. A total of 4.5 million m3 of soil will be removed. Van Oord is deploying its large backhoe dredger Goliath and some split hopper dredgers for the necessary activities, which will be executed in 2011 and 2012.
机译:立陶宛Klapeida港口管理局已与Van Oord签署了一项合同,以加深和拓宽通往该港口的通道。这是范·奥德在波罗的海国家的首项任务。该合同涉及沿近六公里长的通道加深至-14.5米。该通道还将从120米增加到150米,扩大30米。总共将清除450万立方米的土壤。范欧德(Van Oord)正在部署大型挖土机Goliath和一些分料斗式挖泥机,以进行必要的活动,这些活动将于2011年和2012年执行。

著录项

  • 来源
    《Maritime by Holland magazine》 |2011年第8期|p.8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号