【24h】

Good to know

机译:很高兴知道

获取原文
获取原文并翻译 | 示例
           

摘要

Heerema Zwijndrecht will procure and construct a topside and jacket for an unmanned and sustainable satellite platform for the Pll-E field in commission of Oranje-Nassau Energie. The Pll-E platform is a natural gas processing offshore facility, where the gas feed from the Pll-E field, located 55 kilometres North West off the port of Rotterdam, will be treated. The topside will measure 31 by 25 metres, with a height of 13 metres, weighing 500 tonnes. The jacket will have a height of 49 metres with a foot print of 20 by 20 metres and a weight of around 1,000 tonnes. The works onshore are planned to be finished late April 2016.
机译:Heerema Zwijndrecht将为Oranje-Nassau Energie的委员会采购并建造Pll-E领域无人值守且可持续的卫星平台的顶面和夹克。 Pll-E平台是一个天然气加工海上设施,将处理鹿特丹港口西北角55公里处的Pll-E气田的天然气。顶面的高度为31米,宽25米,高13米,重500吨。这件夹克的高度为49米,足迹为20 x 20米,重量约为1,000吨。陆上工程计划于2016年4月下旬完成。

著录项

  • 来源
    《Maritime by Holland magazine》 |2015年第6期|791113-1416|共6页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号