首页> 外文期刊>Marine Log >SPS overlay restores ITB tank top plating
【24h】

SPS overlay restores ITB tank top plating

机译:SPS覆盖层可恢复ITB罐顶电镀

获取原文
获取原文并翻译 | 示例
           

摘要

Intelligent Engineering (UK) Ltd has completed work to reinstate the tank top plating of three holds on TECO Ocean Shipping's (TOS) integrated tug barge, Gayle Eustace, using its patented SPS. This is the third project undertaken by Intelligent Engineering (IE) on behalf of Tampa, Fla.-based TOS. Other projects include the reinstatement of tank top plating of two holds on the Doris Guenther at ASMAR Shipyard in Talc-ahuano, Chile, October 2004 and similar work in two holds on the Gayle Eustace in May 2003. This latest repair and strengthening project of 1,014 m~2 was completed at J. Ray McDermott subsidiary Talleres Navales del Golfo, S.A. de C.V. (TNG) in Veracruz , Mexico in September.
机译:Intelligent Engineering(UK)Ltd已完成使用其专利的SPS恢复TECO Ocean Shipping(TOS)集成拖船Gayle Eustace的三个货舱的舱顶板的工作。这是智能工程(IE)代表佛罗里达州坦帕市TOS承担的第三个项目。其他项目包括2004年10月在智利Talc-ahuano的ASMAR造船厂恢复Doris Guenther的两个货舱的罐顶板,并于2003年5月在Gayle Eustace的两个货舱中进行类似的工作。这一最新的维修和加固项目为1,014个m〜2在J. Ray McDermott的子公司Talleres Navales del Golfo,SA de CV完成(TNG)于9月在墨西哥韦拉克鲁斯举行。

著录项

  • 来源
    《Marine Log》 |2005年第11期|p.46-47|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 水路运输;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号