首页> 外文期刊>Marine engineers review >GE's latest FREMM units
【24h】

GE's latest FREMM units

机译:GE最新的FREMM装置

获取原文
获取原文并翻译 | 示例
           

摘要

GE marine has delivered two LM2500+G4 aeroderiva-tive marine gas turbines to Turin-based Avio for installation onboard the Italian and French Navy's fifth and seventh FREMM frigates, respectively. The FREMM project marks the first application in the marine sector of GE's LM2500+G4 gas turbine, which is reported to have 17% more power than its LM2500+ predecessor. 'The LM2500+G4 benefits from the outstanding reliability and marine operating experience of the LM2500, which has logged more than I3M hours in marine service,' the company said.
机译:GE海军陆战队已向都灵的Avio公司交付了两架LM2500 + G4航空可气化船用燃气轮机,分别安装在意大利和法国海军的第五和第七艘FREMM护卫舰上。 FREMM项目标志着GE的LM2500 + G4燃气轮机在海运领域的首次应用,据报道,该功率比其LM2500 +燃气轮机多17%。该公司表示,“ LM2500 + G4得益于LM2500出色的可靠性和海上操作经验,该产品在海上服务中的记录时间超过了I3M小时。”

著录项

  • 来源
    《Marine engineers review》 |2012年第11期|9-9|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号