...
首页> 外文期刊>Marine engineers review >A senior wave energy engineer
【24h】

A senior wave energy engineer

机译:资深波能工程师

获取原文
获取原文并翻译 | 示例
           

摘要

I leave my sunny Edinburgh flat and drive down to our main office in Leith docks. Some days I cycle or even run to the office, but I know I have a busy week ahead, including a trip to the archipelago of Orkney in northern Scotland, so time is of the essence. I spend the morning going over all the maintenance work that has been completed on the machines in Orkney since they were last installed and making sure all the paperwork is up to date, including the completion of pre-installation check sheets so that we can install one of the machines later in the week. Once all that's done I get in touch with our client to have the weekly chat about operations in Orkney and what will be going on that week.
机译:我离开阳光明媚的爱丁堡,然后下车去我们位于利斯码头的总公司。有时候我会骑车甚至去办公室,但我知道我接下来的一周很忙,包括去苏格兰北部奥克尼群岛旅行,所以时间至关重要。自从上次安装以来,我花了整个上午对Orkney的机器进行的所有维护工作,并确保所有文书工作都是最新的,包括完成安装前检查表,以便我们可以安装一个本周晚些时候的机器。完成所有这些工作后,我将与我们的客户保持联系,以每周就Orkney的运营情况以及该周的情况进行交谈。

著录项

  • 来源
    《Marine engineers review》 |2013年第9期|25-26|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号