On 5 May 2012, the 185.74m geared bulk carrier ID Integrity departed from Shanghai, China. The ship was in ballast and bound for Townsville, Australia, where it was to load a cargo of sugar. En route, the crew carried out an exchange of the ship's ballast water in accordance with Australian ballast water management requirements that required the running of two of the ship's three diesel generators. The ship's engineers found that diesel generator numbers 2 (DG2) and 3 (DG3) could not carry the required load, so they dismantled and cleaned the tur-bochargers. They were found to be heavily contaminated with carbon. In the days following this maintenance, DG2 was used to supply all the ship's electrical needs.
机译:2012年5月5日,这艘185.74m的带齿散货船ID Integrity从中国上海出发。该船在压载状态下开往澳大利亚的汤斯维尔,在那儿装载糖类货物。在途中,船员根据澳大利亚压舱水管理要求进行了船上压舱水的更换,该管理要求船舶的三台柴油发电机中的两台必须运转。该船的工程师发现2号(DG2)和3号(DG3)柴油发电机无法承受所需的负荷,因此他们拆除并清洗了涡轮增压器。发现它们被碳严重污染。在维护之后的几天里,DG2被用来满足船舶的所有电力需求。

著录项

  • 来源
    《Marine engineers review》 |2014年第decaajana期|17-19|共3页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号