首页> 外文期刊>Magazine of Concrete Research >An experimental investigation of thermal prestressing method for continuous composite steel girder bridges
【24h】

An experimental investigation of thermal prestressing method for continuous composite steel girder bridges

机译:连续组合钢梁桥热预应力方法的试验研究

获取原文
获取原文并翻译 | 示例
           

摘要

This paper describes an experimental investigation conducted to verify and substantiate the preceding analytical study, which was focused on the development of the thermal prestressing method (TPSM) including the basic concepts of the method and the methodology for numerical analysis of the thermal prestressing effect. The experimental results from this research, especially the initial stress measurement from a prototype bridge, prove that the method can be successfully used for prestressing continuous composite girder structures. Also, the experimental and analytical results exhibit good agreement, which implies that the thermal prestressing effect can be predicted with reasonable accuracy with the previous proposed methodology. It is concluded that the TPSM can be successfully applied to both the design and construction of continuous composite girder structures, and the authors are optimistic about the TPSM becoming an innovative solution for prestressing continuous composite girder bridges.
机译:本文介绍了一项实验研究,以验证和证实先前的分析研究,该研究专注于热预应力方法(TPSM)的发展,包括该方法的基本概念和热预应力效果的数值分析方法。这项研究的实验结果,尤其是原型桥的初始应力测量,证明该方法可以成功地对连续组合梁结构进行预应力。而且,实验和分析结果显示出良好的一致性,这意味着可以使用先前提出的方法以合理的精度预测热预应力效果。结论是,TPSM可以成功地应用于连续组合梁结构的设计和施工,作者对TPSM成为预应力连续组合梁桥梁的创新解决方案感到乐观。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号