首页> 外文期刊>Journal of Water Resources Planning and Management >Effective Approach for Solving Battle of Water Calibration Network Problem
【24h】

Effective Approach for Solving Battle of Water Calibration Network Problem

机译:解决水标定网络难题的有效途径

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents an effective approach for calibrating an extended period simulation (EPS) model of water distribution system. By using the benchmark model calibration problem, set up for Battle of Water Calibration Networks (BWCN), the EPS model calibration is solved in a progressive manner, optimizing model parameters and engineering judgments. The model calibration approach consists of multiple steps, including: (1) constructing the initial EPS model with the given system and supervisory control and data acquisition (SCADA) data, (2) calibrating pipe properties and pump curves for static and fire flow test data, and (3) calibrating EPS model demands and controls for given SCADA data over 167 h. The calibration was iteratively conducted per district meter area (DMA) and then fine-tuned for the whole system. Although the field data contained some noise, good model calibration was achieved for BWCN. By using the practically measurable hydraulic attributes of pump flows, pressures, and tank levels provided for BWCN, the performance of the calibrated model is compared with those calibrated by 14 teams around the world participating in the BWCN.
机译:本文提出了一种有效的方法来校准供水系统的扩展周期模拟(EPS)模型。通过使用为水标定网络之战(BWCN)设置的基准模型标定问题,可以逐步解决EPS模型标定,优化模型参数和工程判断。模型校准方法包括多个步骤,包括:(1)使用给定的系统以及监督控制和数据采集(SCADA)数据构建初始EPS模型,(2)校准管道特性和泵曲线以获取静态和火流测试数据,以及(3)在167小时内针对给定的SCADA数据校准EPS模型的要求和控制。校准是按每米区域(DMA)反复进行的,然后针对整个系统进行微调。尽管现场数据包含一些噪声,但BWCN仍获得了良好的模型校准。通过使用为BWCN提供的泵流量,压力和油箱液位的可实际测量的液压属性,将校准模型的性能与世界各地参加BWCN的14个团队校准的性能进行比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号