...
首页> 外文期刊>Journal of Scientific & Industrial Research >Simultaneous job scheduling and tool replacement based on tool reliability by proposed Tabu-SA algorithm
【24h】

Simultaneous job scheduling and tool replacement based on tool reliability by proposed Tabu-SA algorithm

机译:提出的Tabu-SA算法基于工具可靠性的同时作业调度和工具更换

获取原文
获取原文并翻译 | 示例
           

摘要

This paper addresses integrated job scheduling and tool replacement problems in a single machine environment with objectives to determine optimal job sequence, tool selection for operation, tool replacement schedule, and number of spares for each tool type, in such a way that total expected production cost is minimized. Since problem is NP-hard, a hybrid algorithm [Tabu-simulated annealing (SA)] is proposed to simultaneously provide job sequencing, tool replacement intervals and number of spare tools required. Tabu-SA is examined and results are compared by solving a real-sized example problem.
机译:本文旨在解决单个机器环境中的集成作业计划和工具更换问题,目标是确定最佳作业顺序,用于操作的工具选择,工具更换计划以及每种工具类型的备件数量,以使总预期生产成本得以实现被最小化。由于问题是NP难题,因此提出了一种混合算法[Tabu模拟退火(SA)],以同时提供作业顺序,刀具更换间隔和所需的备用刀具数量。通过解决实际大小的示例问题,对Tabu-SA进行了检查并比较了结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号