...
首页> 外文期刊>Journal of Scheduling >Scheduling reclaimers serving a stock pad at a coal terminal
【24h】

Scheduling reclaimers serving a stock pad at a coal terminal

机译:安排在煤炭码头为取料库服务的取料机

获取原文
获取原文并翻译 | 示例
           

摘要

We study a variant of an abstract scheduling problem inspired by the management of reclaimers in the stockyard of a coal export terminal. We prove NP-completeness of the problem and formulate it as a mixed-integer program. We show that for a given reclaiming sequence, the problem can be solved in pseudo-polynomial time. In addition, we provide simple, constant-factor approximation algorithms as well as exact branch-and-bound algorithms. An extensive computational study analyzes the performance of the algorithms.
机译:我们研究了一个抽象调度问题的变体,该问题是受煤炭出口码头堆场取料机管理的启发而产生的。我们证明问题的NP完备性并将其表述为混合整数程序。我们表明,对于给定的回收序列,可以在伪多项式时间内解决该问题。此外,我们提供了简单的,恒定因子近似算法以及精确的分支定界算法。大量的计算研究分析了算法的性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号