Solving the electricity production planning problem by a column generation based heuristic

机译:通过基于列生成的启发式方法解决电力生产计划问题

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents a heuristic method based on column generation for the EDF (Electricité De France) long-term electricity production planning problem proposed as subject of the ROADEF/EURO 2010 Challenge. This is to our knowledge the first-ranked method among those methods based on mathematical programming, and was ranked fourth overall. The problem consists in determining a production plan over the whole time horizon for each thermal power plant of the French electricity company, and for nuclear plants, a schedule of plant outages which are necessary for refueling and maintenance operations. The average cost of the overall outage and production planning, computed over a set of demand scenarios, is to be minimized. The method proceeds in two stages. In the first stage, dates for outages are fixed once for all for each nuclear plant. Data are aggregated with a single average scenario and reduced time steps, and a set-partitioning reformulation of this aggregated problem is solved for fixing outage dates with a heuristic based on column generation. The pricing problem associated with each nuclear plant is a shortest path problem in an appropriately constructed graph. In the second stage, the reload level is determined at each date of an outage, considering now all scenarios. Finally, the production quantities between two outages are optimized for each plant and each scenario by solving independent linear programming problems.
机译:本文提出了一种基于列生成的启发式方法,以解决作为ROADEF / EURO 2010挑战的主题而提出的EDF(法国电力)长期电力生产计划问题。据我们所知,这是基于数学编程的方法中排名第一的方法,在整体上排名第四。问题在于确定法国电力公司的每个火力发电厂和核电厂在整个时间范围内的生产计划,这是加油和维护操作所必需的工厂停工时间表。应将根据一组需求方案计算的总体停机和生产计划的平均成本降至最低。该方法分两个阶段进行。在第一阶段,每个核电厂的停运日期固定一次。使用单个平均方案和减少的时间步长汇总数据,并解决了此汇总问题的集划分重新公式化,以基于列生成的启发式方法来确定停机日期。在适当构造的图中,与每个核电厂相关的定价问题是最短路径问题。在第二阶段中,现在考虑所有情况,在停电的每个日期确定重载级别。最后,通过解决独立的线性规划问题,针对每个工厂和每种方案优化两次停机之间的生产量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号