...
首页> 外文期刊>Journal of Planning & Environment Law >Barratt Homes Ltd v DWR Cymru Cyfyngedig (Welsh Water)
【24h】

Barratt Homes Ltd v DWR Cymru Cyfyngedig (Welsh Water)

机译:巴拉特住宅公司诉DWR西姆鲁·辛菲格(Welsh Water)

获取原文
获取原文并翻译 | 示例
           

摘要

Planning permission-developer sought to connect to the public sewer at specific location-sewerage undertaker objected to connection at that location because of the risk of overspill-whether sewerage undertaker entitled to require the connection to be made at an alternative location-whether by serving its response outside the 21-day limit set by the Water Industry Act 1991 the sewerage undertaker lost the right to object to the connection at the specified location-whether the answer was affected by the EC Directive on the Treatment of Urban Waste WaterrnBarratt Homes Ltd (Barratt) was engaged in a development of a site at Llanfoist, Abergavenny. It had planning permission dated May 14, 2007 for 98 houses and a school.
机译:规划许可开发者试图在特定位置连接到公共下水道-污水处理承办人由于溢漏的风险而反对在该位置进行连接-污水处理承办人是否有权要求在其他位置进行连接-是否通过服务于其在1991年《水工业法》所规定的21天期限之外做出回应的情况下,排污承办商失去了在指定位置反对连接的权利-答案是否受到EC关于城市废水处理的指令的影响rnBarratt Homes Ltd(Barratt )参与了Abergavenny Llanfoist网站的开发。它于2007年5月14日获得了98栋房屋和一所学校的规划许可。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号