...
首页> 外文期刊>Journal of Petroleum Technology >FRACTURE-STIMULATION TECHNOLOGY FOR GAS-STORAGE WELLS
【24h】

FRACTURE-STIMULATION TECHNOLOGY FOR GAS-STORAGE WELLS

机译:储气井裂缝模拟技术

获取原文
获取原文并翻译 | 示例
           

摘要

Since introduction of Federal Energy Regulatory Commission (FERC) Order 636, the fundamental role of the interstate gas-transportation business has changed from that of intermediary between producer and consumer to that of a service provider. Further, because these services are now unbundled and cannot be lumped into the supplier rate base, pipeline companies must now provide each of their services individually and at increasingly competitive prices. Some of these services include gas transportation, market-center hub services (e.g., balancing, compression, loaning, parking, peaking, trading), and gas storage. Gas storage is used for two primary purposes: to meet seasonal winter demands for natural gas (base-load storage) and to meet short-term peaks in demand (peaking storage), which can range from a few hours to a few days. For purely peak demand, cavern storage has become increasingly popular because of the extremely high deliverability that can be achieved, albeit only for short periods of time. Base-load storage facilities, for which depleted oil/gas fields are frequently used, can store larger volumes of gas but usually have smaller overall deliverability capacities. Nevertheless, minimum deliverability requirements exist for base-load storage facilities.
机译:自从引入联邦能源管理委员会(FERC)第636号命令以来,州际天然气运输业务的基本作用已从生产者和消费者之间的中介角色转变为服务提供商。此外,由于这些服务现在是非捆绑式的,无法纳入供应商价格基础,因此管道公司现在必须以日益具有竞争力的价格单独提供其每项服务。其中一些服务包括天然气运输,市场中心枢纽服务(例如,平衡,压缩,借贷,停车,调峰,交易)和天然气存储。储气有两个主要用途:满足冬季季节性天然气需求(基本负荷存储)和满足需求的短期高峰(峰值存储),范围从几个小时到几天不等。对于纯粹的高峰需求,洞穴存储由于可以实现的极高的可交付性而变得越来越流行,尽管只能在短时间内进行。经常使用枯竭的油气田的基本负荷存储设施可以存储更大数量的天然气,但总的输送能力通常较小。但是,对于基本负载存储设施存在最低的可交付性要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号