首页> 外文期刊>Journal of Management in Engineering >Team Integration and Owner Satisfaction: Comparing Integrated Project Delivery with Construction Management at Risk in Health Care Projects
【24h】

Team Integration and Owner Satisfaction: Comparing Integrated Project Delivery with Construction Management at Risk in Health Care Projects

机译:团队整合和业主满意度:将综合项目交付与医疗项目中处于风险中的施工管理进行比较

获取原文
获取原文并翻译 | 示例
           

摘要

Team integration among project stakeholders is paramount to achieving successful project outcomes and better value to the owner. Project delivery methods are key influences on the level of team integration as well as project performance. Integrated project delivery (IPD) is receiving increasing attention from both industry and academia because of the high degree of team integration it delivers. However, there is little research on the effects of IPD on the level of team integration and project success in comparison with construction management at risk (CMR). This research investigated how project delivery methods influence the level of team integration achieved in two alternative project delivery methods: IPD and CMR. This study further examined whether the difference in the level of team integration achieved by the two delivery methods has an effect on the degree of owner satisfaction with project outcomes. This study adopted an explanatory case study approach based on mixed research methods including qualitative and quantitative analysis using 17 health care projects executed by Construction Industry Institute (CII) member companies. The results showed that the levels of team integration in the IPD projects were significantly greater than those in the CMR projects, and that the levels of team integration were highly correlated with those of owner satisfaction with project outcomes. This research provides empirical evidence to support that higher team integration achieved by IPD compared to CMR leads to an owner being more satisfied with project outcomes. Although the findings are valid for health care projects delivered by CII members and, thus, need to be interpreted with caution, they can still provide meaningful insights into relationships of project delivery method and team integration with owner's satisfaction. (C) 2018 American Society of Civil Engineers.
机译:项目利益相关者之间的团队整合对于实现成功的项目成果和为所有者带来更好的价值至关重要。项目交付方式是对团队整合水平和项目绩效的关键影响。由于集成项目交付(IPD)交付的团队高度集成,因此越来越受到业界和学术界的关注。但是,与风险管理(CMR)相比,关于IPD对团队整合和项目成功程度的影响的研究很少。这项研究调查了项目交付方法如何影响在两种替代项目交付方法(IPD和CMR)中实现的团队整合水平。这项研究进一步检验了通过两种交付方式实现的团队整合水平的差异是否对业主对项目成果的满意度有影响。本研究采用了一种解释性案例研究方法,该方法基于混合研究方法,包括使用由建筑工业协会(CII)成员公司执行的17个医疗项目进行的定性和定量分析。结果表明,IPD项目中的团队集成水平显着高于CMR项目中的团队集成水平,并且团队集成水平与所有者对项目成果的满意度高度相关。这项研究提供了经验证据,以支持IPD与CMR相比实现了更高的团队整合,从而使业主对项目成果更加满意。尽管这些发现对于CII成员交付的医疗项目是有效的,因此需要谨慎解释,但它们仍可以为项目交付方法和团队整合与业主满意度之间的关系提供有意义的见解。 (C)2018美国土木工程师学会。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号