Managing Construction Projects through Dynamic Modeling: Reviewing the Existing Body of Knowledge and Deriving Future Research Directions

机译:通过动态建模管理建设项目:审查现有知识体系并得出未来的研究方向

获取原文
获取原文并翻译 | 示例
           

摘要

To improve decision making in construction projects, dynamic models have been developed to grasp the complex project dynamics that traditional scheduling and decision-making techniques miss. However, each of the existing dynamic models focuses only on limited parameters impacting the project management cycle and thus are unable to capture the full picture. Accordingly, this paper reviews the existing literature related to utilizing dynamic modeling for construction management applications with the objective of grasping in a holistic manner the direct and indirect impacts of different project parameters. To this effect, the authors: (1) conducted a meta-analysis of previous studies of dynamic modeling in construction management; (2) identified and defined interrelated dynamic parameters that impact project performance; and (3) used social network analysis (SNA) to quantitatively pinpoint the strengths and gaps in the literature and provide a roadmap toward the areas that should be further addressed. For example, one of the important findings is the need to further investigate the dynamics of out-of-sequence work and its impact on project performance, since such dynamics were found to be rarely examined. Another important finding is the absence of models incorporating simultaneously all dynamic parameters. The paper concludes by presenting guidelinesincluding a conceptual frameworkto proactively derive future research directions toward more effective and efficient management of today's complex construction projects. Ultimately, the comprehensive analytic approach suggested by this research could result in better decision-making processes, reduced cost and schedule overruns, and timely and less costly resolution of claims and disputes.
机译:为了改善建筑项目的决策,开发了动态模型来掌握传统调度和决策技术所缺少的复杂项目动态。但是,每个现有的动态模型都只关注影响项目管理周期的有限参数,因此无法全面了解。因此,本文综述了有关将动态建模用于施工管理应用程序的现有文献,目的是从整体上把握不同项目参数的直接和间接影响。为此,作者:(1)对施工管理中动态建模的先前研究进行了荟萃分析; (2)确定并定义影响项目绩效的相互关联的动态参数; (3)使用社交网络分析(SNA)定量地确定了文献中的优势和差距,并提供了应进一步解决的领域的路线图。例如,重要的发现之一是需要进一步研究乱序工作的动态及其对项目绩效的影响,因为发现这种动态很少被检查。另一个重要发现是缺少同时包含所有动态参数的模型。本文最后提出了包括概念框架在内的指导方针,以主动得出未来的研究方向,以更有效地管理当今的复杂建筑项目。最终,这项研究提出的综合分析方法可以导致更好的决策流程,降低成本和进度超支,以及及时和低成本地解决索赔和争议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号