首页> 外文期刊>Journal of industrial and management optimization >FAIRNESS PREFERENCE BASED DECISION-MAKING MODEL FOR CONCESSION PERIOD IN PPP PROJECTS
【24h】

FAIRNESS PREFERENCE BASED DECISION-MAKING MODEL FOR CONCESSION PERIOD IN PPP PROJECTS

机译:基于公平的PPP项目特许期决策模型

获取原文
获取原文并翻译 | 示例
           

摘要

Both government and private sector have the characteristic of fairness preference when deciding a suitable concession period for infrastructure projects. The appropriate concession period is helpful to construct the Public-Private-Partnership (PPP) project, to alleviate governments financial burden, and to boast the economic growth. Therefore, this paper aims to develop a decision-making model of concession period with fairness preference based on the two sides equitable utilities. To better describe decision makers fair psychology, the Nash bargaining game solution was adopted as a fair reference point. The results show that the concession period with fairness preference will become longer than that without fairness preference. Furthermore, the longer the concession period is, the better construction quality of the infrastructure project (highway) is. So, decision makers with fairness preference tend to make good decisions. In conclusion, the developed decision-making model renders useful references for both government and private sector in negotiating the concession period for infrastructure projects.
机译:在决定基础设施项目的适当休息期时,政府和私营部门都有公平偏好的特征。适当的特许期限有助于构建公私伙伴关系(PPP)项目,以减轻政府的经济负担,并促进经济增长。因此,本文旨在基于双方公平公用事业的公平偏好,制定一个特许期间的决策模型。为了更好地描述决策者公平心理学,采用了纳什议价游戏解决方案作为公平参考点。结果表明,公平偏好的特许期会比没有公平偏好的那么长。此外,让步时期越长,基础设施项目(高速公路)的更好的施工质量是。因此,具有公平偏好的决策者倾向于做出良好的决定。总之,发达的决策模式使政府和私营部门谈判谈判基础设施项目的特许期间的有用参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号