首页> 外文期刊>Journal of Indian Water Works Association >Doubling the Water Treatment Plant Capacity from 150 mld to 300mld: A Case Study at Navi Mumbai Municipal Corporation (NMMC)
【24h】

Doubling the Water Treatment Plant Capacity from 150 mld to 300mld: A Case Study at Navi Mumbai Municipal Corporation (NMMC)

机译:将水处理厂的容量从150毫升增加到300毫升:以新孟买市政公司(NMMC)为例

获取原文
获取原文并翻译 | 示例
           

摘要

All over the world the plant augmentation technology is gaining the ground fast for the obvious reasons mentioned above. This is probably for the first time, that the Clariflocculators were augmented on such a large scale. These techniques have a huge potential for application in this country. The resource crunch by default will be a single largest factor influencing in favour of such cost effective and efficient techniques in the near future. Six months have been completed after the commissioning of this project and the augmented plant is running very satisfactorily.
机译:由于上述明显的原因,全世界的植物增强技术正在迅速普及。这可能是第一次,澄清絮凝器得到了如此大规模的扩充。这些技术在该国具有巨大的应用潜力。默认情况下,资源紧缺将是影响在不久的将来采用这种经济高效的技术的最大因素。该项目投产后已经完成了六个月,扩建后的工厂运转非常令人满意。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号