首页> 外文期刊>Journal of Harbin Institute of Technology >Construction project Investment control model based on instant information
【24h】

Construction project Investment control model based on instant information

机译:基于即时信息的建设项目投资控制模型

获取原文
获取原文并翻译 | 示例
           

摘要

Change of construction conditions always influences project investment by causing the loss of construction work time and extending the duration. To resolve such problem as difficult dynamic control in work construction plan, this article presents a concept of instant optimization by ways of adjustment operation time of each working procedure to minimize investment change. Based on this concept, its mathematical model is established and a strict mathematical justification is performed. An instant optimization model takes advantage of instant information in the construction process to duly complete adjustment of construction; thus we maximize cost efficiency of project investment.
机译:施工条件的变化总是会造成施工时间的损失和工期的延长,从而影响项目投资。为了解决施工计划中动态控制困难的问题,本文提出了一种通过调整各工序的操作时间,以尽量减少投资变动的方式进行即时优化的概念。基于这一概念,建立了其数学模型并进行了严格的数学证明。即时优化模型利用施工过程中的即时信息及时完成施工调整。因此,我们可以最大程度地提高项目投资的成本效益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号