首页> 外文期刊>Journal of Environmental Radioactivity >Model testing for the remediation assessment of a radium contaminated site in Olen, Belgium
【24h】

Model testing for the remediation assessment of a radium contaminated site in Olen, Belgium

机译:比利时奥伦的镭污染场地修复评估的模型测试

获取原文
获取原文并翻译 | 示例
           

摘要

Environmental assessment models are used as decision-aiding tools in the selection of remediation options for radioactively contaminated sites. In most cases, the effectiveness of the remedial actions in terms of dose savings cannot be demonstrated directly, but can be established with the help of environmental assessment models, through the assessment of future radiological impacts. It should be emphasized that, given the complexity of the processes involved and our current understanding of how they operate, these models are simplified descriptions of the behaviour of radionuclides in the environment and therefore imperfect. One way of testing and improving the reliability of the models is to compare their predictions with real data and/or the predictions of other models. Within the framework of the Remediation Assessment Working Group (RAWG) of the BIOMASS (BIOsphere Modelling and ASSessment) programme coordinated by IAEA, two scenarios were constructed and applied to test the reliability of environmental assessment models when remedial actions are involved. As a test site, an area of approximately 100 ha contaminated by the discharges of an old radium extraction plant in Olen (Belgium) has been considered. In the first scenario, a real situation was evaluated and model predictions were compared with measured data. In the second scenario the model predictions for specific hypothetical but realistic situations were compared. Most of the biosphere models were not developed to assess the performance of remedial actions and had to be modified for this purpose. It was demonstrated clearly that the modeller's experience and familiarity with the mathematical model, the site and with the scenario play a very important role in the outcome of the model calculations. More model testing studies, preferably for real situations, are needed in order to improve the models and modelling methods and to expand the areas in which the models are applicable.
机译:在选择放射性污染场地的补救方案时,环境评估模型用作决策辅助工具。在大多数情况下,无法直接证明补救措施在节省剂量方面的有效性,而可以在环境评估模型的帮助下通过评估未来的放射学影响来确定。应该强调的是,考虑到所涉及过程的复杂性以及我们目前对它们如何运行的理解,这些模型是对放射性核素在环境中的行为的简化描述,因此是不完善的。测试和提高模型可靠性的一种方法是将其预测与实际数据和/或其他模型的预测进行比较。在由国际原子能机构协调的BIOMASS(生物圈建模和评估)计划的补救评估工作组(RAWG)的框架内,构建了两种方案,并在涉及补救措施时将其应用于测试环境评估模型的可靠性。作为测试地点,已经考虑了约100公顷的面积,该面积被比利时奥伦(Olen)一家老镭提取厂的排放所污染。在第一种情况下,评估了实际情况,并将模型预测与实测数据进行了比较。在第二种情况下,比较了针对特定假设但现实情况的模型预测。大多数生物圈模型不是为评估补救措施的绩效而开发的,因此必须对此进行修改。清楚地表明,建模者的经验和对数学模型,地点和场景的熟悉程度在模型计算的结果中起着非常重要的作用。需要进行更多的模型测试研究,最好是针对实际情况,以改进模型和建模方法并扩展模型适用的领域。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号