首页> 外文期刊>Journal of Constructional Steel Research >An experimental study of the behaviour of reverse channel connection components to concrete filled steel tubes under tension at elevated temperature
【24h】

An experimental study of the behaviour of reverse channel connection components to concrete filled steel tubes under tension at elevated temperature

机译:高温状态下钢管混凝土反向通道连接构件性能的试验研究

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents the results of a series of tests conducted on two components of reverse channel (RC) connection to concrete filled tubular (CFT) column to quantify the load-deflection behaviour of these components at both ambient and elevated temperatures. A total of 21 tests were performed, including 9 tests on the RC component and 12 tests on the face of the CFT section. The RC tests covered two channel widths (150 and 230 mm), two channel web thicknesses (5.5 and 7.5 mm), one and two bolt rows and three temperature levels (20, 550, and 750 ℃). The final failure modes were web fracture around bolt hole, bolt pull-out and bolt fracture. Before these final failure modes which exhibited evidences of membrane action, there were evidences of formation of yield lines around individual bolts and formation of yield lines along the length of the channel section. Due to different reductions in strength of bolt and steel plate at elevated temperatures, the failure mode may be different from that at ambient temperature. In the CFT tests, the loads on the tube surface were applied through two plates welded to the tube along the longitudinal direction. The test variables included two types of hollow section (square hollow section (SHS) and circular hollow section (CHS)), two distances between the welded plates (150 and 230 mm) which corresponded to the two RC widths and three temperature levels (20, 550, and 750 ℃). Four failure modes were attained: weld failure, column face pull out, loading plate fracture and bolt failure.
机译:本文介绍了对反向通道(RC)连接到混凝土填充管式(CFT)柱的两个组件进行的一系列测试的结果,以量化这些组件在环境温度和高温下的载荷-挠度行为。总共进行了21次测试,其中包括RC组件的9个测试和CFT截面的12个测试。 RC测试涵盖两个通道宽度(150和230毫米),两个通道腹板厚度(5.5和7.5毫米),一两个螺栓行和三个温度水平(20、550和750℃)。最终的破坏模式是螺栓孔周围的腹板断裂,螺栓拔出和螺栓断裂。在这些最终的破坏模式表现出膜作用的证据之前,有证据表明在各个螺栓周围形成了屈服线,并且沿着通道截面的长度形成了屈服线。由于螺栓和钢板在高温下强度的不同降低,因此故障模式可能与环境温度下的模式不同。在CFT测试中,通过沿纵向焊接到管子的两块板施加管子表面的载荷。测试变量包括两种类型的空心部分(方形空心部分(SHS)和圆形空心部分(CHS)),焊接板之间的两个距离(150和230 mm)对应于两个RC宽度和三个温度水平(20 ,550和750℃)。达到了四种失效模式:焊接失效,柱面拔出,加载板断裂和螺栓失效。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号