Proactive Productivity Management at Job Sites: Understanding Characteristics of Assumptions Made for Construction Processes during Planning Based on Case Studies and Interviews

机译:作业现场的积极生产力管理:基于案例研究和访谈,了解规划过程中对施工过程的假设特征

获取原文
获取原文并翻译 | 示例
           

摘要

During planning and execution of construction projects, project planners and managers make various assumptions with respect to execution of construction activities, availability of resources, suitability of construction methods, and status of preceding activities. However, not all of these assumptions are explicitly documented and verified before the construction activities start. Decisions made based on invalid assumptions can negatively impact the outcomes of construction projects, such as rework, activity delays, and extra material cost. To address the problems caused by invalid assumptions, this paper proposed to develop a formal approach to capture and represent assumptions and proactively verify assumptions to reduce the uncertainties associated with construction projects. To develop such a formal approach, an initial step is to identify characteristics of assumptions. The research team conducted two detailed case studies (i.e., a bridge rehabilitation project and a research lab renovation project) and seven interviews with construction professionals who have experience between 12 and 50 years. This paper provides a detailed discussion on the assumptions identified from case studies and interviews. The developed categorization of assumptions and the general characteristics of assumptions can serve as the foundation for a formal representation of assumptions, which helps construction professionals to proactively verify assumptions so as to avoid negative impacts of invalid assumptions on construction planning and execution.
机译:在建设项目的计划和执行过程中,项目计划者和管理者对建设活动的执行,资源的可用性,建造方法的适用性以及先前活动的状态做出各种假设。但是,并非所有这些假设都在施工活动开始之前得到了明确的记录和验证。基于无效假设做出的决策可能会对建设项目的结果产生负面影响,例如返工,活动延迟和额外的材料成本。为了解决无效假设引起的问题,本文提出了一种正式方法来捕获和表示假设,并主动验证假设以减少与建设项目相关的不确定性。要开发这种正式方法,第一步是确定假设的特征。研究团队进行了两个详细的案例研究(即桥梁修复项目和研究实验室改造项目),并对具有12至50年经验的建筑专业人士进行了七次采访。本文对通过案例研究和访谈确定的假设进行了详细讨论。假设的分类和假设的一般特征可以作为假设的形式表示的基础,这可以帮助建筑专业人士主动验证假设,从而避免无效假设对施工计划和执行的负面影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号