Project Validation: A Set-Based and Concurrent Design Approach to Inform Owner's Authorization Decision on Complex Projects

机译:项目验证:基于集合和并发的设计方法,可通知所有者对复杂项目的授权决定

获取原文
获取原文并翻译 | 示例
           

摘要

Strictly speaking, there is no way to have certainty of the outcomes or the value of decisions made early in a project. However, early decisions set the path to cost and schedule performance and influence life cycle costs. This study explored project validation as a novel set-based and concurrent design practice during the conceptual phase of complex projects. Because the construction literature obviates set-based design, a grounded theory method was leveraged to elicit a theoretical model that gave primacy to contextual and inductive evidence. The emerging theory guided the data collection, which included interviews, three expert workshops, and observations at validation sessions. Project validation aims at proving or disproving with null design whether the team can deliver a project that satisfies the owner's business case and scope within the owner's allowable constraints of costs, schedule, and acceptable risks. Also, it defines the basis of design and target costs and informs the owner's decision to authorize (go) or not to authorize (no-go) the project. As a departure from the existing literature rooted in point-based design and programming approaches, decisions on concurrent sets of cross-functional design alternatives are purposely delayed during project validation. In doing so, the accumulation of additional information will, later on, enable the team to make design decisions with a systems engineering and value-adding perspective that drives innovation. The results of this study contribute to the advancement of design theory methodology and project definition. (C) 2021 American Society of Civil Engineers.
机译:严格来说,没有办法确定项目的结果或决定的价值。但是,早期决定设定了成本和调度绩效的路径,并影响生命周期成本。本研究探讨了项目验证作为复杂项目概念阶段的新型基于和并发设计实践。由于建筑文献消除了基于集的设计,因此利用接地的理论方法来引出一个理论模型,以提出对语境和归纳证据的原理。新兴理论引导了数据收集,其中包括访谈,三位专家研讨会和验证会议的观察。项目验证旨在通过NULL设计证明或消除,无论团队是否可以提供一个满足所有者的商业案例和人员的允许的成本,进度和可接受风险范围的项目。此外,它定义了设计和目标成本的基础,并通知所有者的决定授权(GO)或不授权(无-Go)项目。作为从现有文献的源于基于点的设计和编程方法,在项目验证期间有意延迟了关于基于点的设计和编程方法的决策。在这样做时,稍后将累积附加信息,使团队能够与驱动创新的系统工程和价值添加透视进行设计决策。本研究的结果有助于推进设计理论方法和项目定义。 (c)2021年美国土木工程师协会。

著录项

  • 来源
    《Journal of Construction Engineering and Management》 |2021年第10期|04021132.1-04021132.10|共10页
  • 作者单位

    Arizona State Univ Sch Sustainable Engn & Built Environm POB 873005 Tempe AZ 85287 USA;

    Univ Pittsburgh Swanson Sch Engn Pittsburgh PA 15261 USA;

    Univ North Carolina Charlotte Sch Engn Technol & Construct Management Charlotte NC 28223 USA;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号