Statistical analysis for comparison of overall performance of projects using Weibull analysis on earned value metrics Weibull 51591168

机译:使用挣值度量的威布尔分析对项目总体绩效进行比较的统计分析威布尔51591168

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Most organizations have evaluated project performance primarily through cost and schedule performance measures, such as earned value management, for projects. However, to date, few tools in the project management literature have been proposed for enabling comparisons of the overall performance of projects. This study introduces a simple index, the critical ratio in time (CR(t)), as a measure of the overall performance of a project. The index can be easily calculated on the basis of the earned value (EV) data, which are normally available from a project cost system. Based on the index, a statistical analysis for the comparison of the overall performance of projects using Weibull analysis on EV metrics is proposed. The statistical analysis can be performed on a spreadsheet, such as Microsoft® Excel®. Furthermore, the detailed steps in the analysis are discussed along with an example in which five sample projects are analyzed and compared. Based on the obtained results, the author concludes that the proposed approach on the basis of CR(t) data can provide a robust and effective method for managers to evaluate and compare the overall performance of projects, and can be applicable in evaluating the project whose value has been determined (e.g. contracted projects). CR(t) () Weibull MS EXCEL View full textDownload full textKeywordsearned value metrics, critical ratio in time, project performance, Weibull analysisKeywords WeibullRelated var addthis_config = { ui_cobrand: "Taylor & Francis Online", services_compact: "citeulike,netvibes,twitter,technorati,delicious,linkedin,facebook,stumbleupon,digg,google,more", pubid: "ra-4dff56cd6bb1830b" }; Add to shortlist Link Permalink http://dx.doi.org/10.1080/10170669.2010.532598
机译:大多数组织主要通过成本和进度绩效度量(例如,挣值管理)评估项目绩效。但是,迄今为止,在项目管理文献中很少提出用于比较项目总体绩效的工具。这项研究引入了一个简单的指标,即时间的关键比率(CR(t)),作为衡量项目总体绩效的指标。可以根据通常可从项目成本系统获得的挣值(EV)数据轻松计算该指数。在该指标的基础上,提出了基于EV指标的Weibull分析对项目总体绩效进行比较的统计分析。可以在电子表格(例如Microsoft®Excel®)上执行统计分析。此外,还讨论了分析中的详细步骤,并举例说明了五个样本项目的分析和比较。基于获得的结果,作者得出结论,基于CR(t)数据的建议方法可以为管理人员评估和比较项目的整体绩效提供一种鲁棒而有效的方法,并且可以应用于评估其项目的绩效。价值已经确定(例如合同项目)。 CR(t)()Weibull MS EXCEL查看全文下载全文关键字赚取的价值指标,时间的关键比率,项目绩效,Weibull分析关键字Weibull相关变量var addthis_config = {ui_cobrand:“泰勒和弗朗西斯在线”,service_compact:“ citeulike,netvibes,twitter, technorati,delicious,linkedin,facebook,stumbleupon,digg,google,more“,发布:” ra-4dff56cd6bb1830b“};添加到候选列表链接永久链接http://dx.doi.org/10.1080/10170669.2010.532598

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号