...
首页> 外文期刊>Japanese railway engineering >Outline of Series 300X EMU Shinkansen Train Built for Testing Purpose at High Speed
【24h】

Outline of Series 300X EMU Shinkansen Train Built for Testing Purpose at High Speed

机译:300X系列动车组新干线列车的概要,用于高速测试

获取原文
获取原文并翻译 | 示例
           

摘要

Series 300X EMU Shinkansen train is built to make exhaustive inquiries into an ideal high-speed railway system depending on the friction between rail and wheel for the purpose of developing the latest and the best railway system viewed from various points including not only rolling-stock but ground facilities. This test train was completed in Jan., 1995, and a variety of tests are under way on the Tokaido Shinkansen. Outline of test train is introduced referring to the aim of development and problems to be solved for accomplishment of higher-speed train operation of railway.
机译:300X系列EMU新干线列车的制造是根据轨道和车轮之间的摩擦力,对理想的高速铁路系统进行详尽的查询,目的是开发从各种角度来看不仅包括机车车辆,而且从各个角度来看最新和最佳的铁路系统地面设施。该测试火车于1995年1月完成,并且在东海道新干线上正在进行各种测试。介绍了试验列车的概述,并指出了铁路高速列车发展的目标和要解决的问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号