首页> 外文期刊>International Water Power & Dam Construction >BC Hydro sees power output fall in April-June period
【24h】

BC Hydro sees power output fall in April-June period

机译:卑诗水电公司认为4月至6月电力输出下降

获取原文
获取原文并翻译 | 示例
           

摘要

BC hydro suffered a 19% fall in hydro power generation over April-June compared to the same three month period last year, but storage levels were higher than average by the end of the quarter.rnThe British Columbian utility said the decrease in output was due to lower water inflows and unplannedrnequipment outages at two major units in April. The outages were suffered by one generating unit at the GM Shrum plant in the Peace river region, and a unit at Mica Dam on the Columbia.rnHowever, it noted that the fiscal first quarter to 30 June ended with reservoir storage levels slightly up on averagerndue to higher inflows in the last month.
机译:不列颠哥伦比亚省公用事业公司表示,4月至6月,卑诗省水电公司的水力发电量与去年同期的三个月相比下降了19%,但储能水平高于该季度末的平均水平。以减少四月份两个主要单位的进水量和计划外设备停机。停电的原因是位于和平河地区的GM Shrum工厂的一个发电机组和位于哥伦比亚的云母大坝的一个机组。然而,它指出,截至6月30日的第一财政季度结束时,水库的存储水平平均略有上升。到上个月流入量增加。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号