...
首页> 外文期刊>International Transport Journal >A gantry to double capacities
【24h】

A gantry to double capacities

机译:龙门架使容量翻倍

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The inland port of Strasbourg's new crane can handle up to 300,000 teu per year. It is now possible to load and discharge two barges, lying side by side.rnThe inland port of Strasbourg (France) recently put a new gantry into service. It was built by the Austrian firm Kiinz. The new equipment is part of a programme to expand the city's northern container terminal's capacity. A total of EUR 15 million has been contributed by the French state and local and regional entities for the 2007-2013 regional development scheme. The expansion of the north terminal to 8 ha is in response to the steadily growing need for more box handling facilities. Thanks to the new gantry, the port's container handling capacity is now 300,000 teu per year. This is a twofold increase compared to the number of boxes that could be handled in 2004 (156,436 teu).
机译:斯特拉斯堡的新起重机的内陆港口每年可处理300,000 teu。现在,可以并排放置两个驳船。斯特拉斯堡的内陆港口(法国)最近启用了一个新的龙门。它是由奥地利公司Kiinz建造的。新设备是扩大城市北部集装箱码头产能的计划的一部分。法国国家,地方和地区实体共为2007-2013年地区发展计划捐款1500万欧元。北航站楼扩建至8公顷是为了满足对越来越多的装箱设施不断增长的需求。得益于新的门架,该港口的集装箱处理能力现已达到每年30万标准箱。与2004年可处理的箱子数量(156,436标准箱)相比,增加了两倍。

著录项

  • 来源
    《International Transport Journal》 |2010年第40期|p.23|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号