...
首页> 外文期刊>International journal of urban sciences >London 2012: changing delivery patterns in response to the impact of the Games on traffic flows
【24h】

London 2012: changing delivery patterns in response to the impact of the Games on traffic flows

机译:2012年伦敦奥运会:根据奥运会对交通流量的影响,改变交付方式

获取原文
获取原文并翻译 | 示例
           

摘要

The paper addresses road freight transport operations during the London Olympic and Paralympic Games in 2012. It presents work carried out prior to the Games to understand pre-Games patterns of freight deliveries in London (for both light and heavy goods vehicles) and the results of modelling work carried out to assess the likely impacts of the Games road restrictions on freight operations. The modelling results indicated that increases in total hours travelled carrying out collection and delivery work would range from 1.4% to 11.4% in the six sectors considered. The results suggested increases in hours travelled in excess of 3.5% in four of the six sectors modelled. The possible actions that could be taken by organizations to reduce these negative impacts were also modelled and the results indicated that such actions would help to mitigate the impact of the road restrictions imposed on operators during the Games. The actual impacts of the 2012 Games on transport both in general terms and specifically in terms of freight transport are also discussed, together with the success of the actions taken by Transport for London (TfL) to help the road freight industry. The potential freight transport legacy of the London 2012 Games in terms of achieving more sustainable urban freight transport is considered and the steps being taken by TfL to help ensure that such a legacy can be realized are discussed. Such steps include policy-makers continuing to collaborate closely with the freight industry through the 'London Freight Forum', and TfL's efforts to encourage and support companies revising their delivery and collection times to the off-peak; improving freight planning in the design and management of TfL-funded road schemes; electronic provision of traffic information by TfL to the freight industry, and the further development of freight journey planning tools.
机译:本文介绍了2012年伦敦奥运会和残奥会期间的公路货运运营情况。该文件介绍了奥运会之前进行的工作,以了解赛前伦敦(轻型和重型货车)货物运输方式以及运输结果。为评估奥运会道路限制对货运运营的可能影响而进行的建模工作。建模结果表明,在所考虑的六个部门中,执行收集和交付工作的总时数增加了1.4%至11.4%。结果表明,在所建模的六个行业中,有四个行业的旅行时数增长超过3.5%。还对组织为减少这些负面影响而可能采取的行动进行了建模,结果表明,此类行动将有助于减轻奥运会期间道路限制对运营商的影响。还讨论了2012年奥运会对运输的一般影响,特别是对货物运输的实际影响,以及伦敦运输公司(TfL)为帮助公路货运业采取的行动取得的成功。考虑了伦敦2012年奥运会在实现更可持续的城市货运方面的潜在货运遗留问题,并讨论了TfL正在采取的帮助确保这种遗留遗留物实现的步骤。这些步骤包括:决策者继续通过“伦敦货运论坛”与货运业紧密合作,以及TfL鼓励和支持公司将其非高峰期的交货和收货时间缩短的努力;在TfL资助的道路计划的设计和管理中改进货运计划; TfL以电子方式向货运业提供交通信息,并进一步开发货运行程计划工具。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号