...
首页> 外文期刊>International Journal of Project Management >Predicting final cost for competitively bid construction projects using regression models
【24h】

Predicting final cost for competitively bid construction projects using regression models

机译:使用回归模型预测竞标建设项目的最终成本

获取原文
获取原文并翻译 | 示例
           

摘要

This paper studies the relationship between the low bid and completed cost for competitively bid highway projects. Data are analyzed from several agencies managing highway and dredging projects. A natural log transformation of the low bid and final cost was found to produce regression models for each agency that had high R and R~2 values. These models can predict completed project cost using only the project low bid as input. A separate regression model was determined for each agency. Based on the form of the calculated models it appears that highway agencies construct projects where the final cost increases as an increasing percentage of the low bid price as the project magnitude increases. The dredging projects appear to follow different mechanisms of cost increase than the highway projects and were not predicted as well by the regression models. The regression models can also be used for budgeting purposes by submitting the sum of the low bids for a group of projects as input. The regression models output a prediction of the cost of the group of projects that was found to be highly accurate.
机译:本文研究了公路竞标项目的低标价和完工成本之间的关系。从管理高速公路和疏projects项目的几个机构分析数据。发现低投标和最终成本的自然对数转换可以为具有较高R和R〜2值的每个代理商生成回归模型。这些模型仅使用项目低价作为输入就可以预测完成的项目成本。为每个机构确定了单独的回归模型。根据计算模型的形式,看来公路代理机构在建设的项目中,随着项目规模的增加,最终成本会随着低价竞标价格的增加而增加。与公路项目相比,疏projects项目似乎遵循不同的成本增加机制,并且回归模型也未对其进行预测。通过提交一组项目的低价总和作为输入,回归模型也可以用于预算目的。回归模型输出预测的一组项目的成本的预测,该预测非常准确。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号