首页> 外文期刊>International Journal of Project Management >Study on safety control for Wuhan metro construction in complex environments
【24h】

Study on safety control for Wuhan metro construction in complex environments

机译:复杂环境下武汉地铁施工安全控制研究

获取原文
获取原文并翻译 | 示例
           

摘要

Open cut method is adopted in the foundation pit construction of Wuhan Metro Line 2 (WML2) XunLiMen Station which is under the bridge of the (existent) operating light rail. The foundation pit is only 1.25 m away from the nearest pier of Wuhan Light Rail Line 1 (WLRL1). Safety control of this project focuses on how foundation pit construction affects the safety of light rail bridge and its operation. In this paper, finite difference software FLAC3D for geotechnical engineering is applied to simulating the process of the foundation pit excavation and to analyze the impact of the isolation pile construction, the underground diaphragm wall construction and the foundation pit dewatering and excavation on the bridge piers of WLRL1, while the finite element software ANSYS is used to simulate the numerical model of WLRL1. Moreover, the study of the impact of the construction scheme of WML 2 on the operation of WLRL1 is also presented in the paper. Finally, on the basis of the simulation results, (the) control standards for the operation safety of WLRL1 and (the) advices for the safety control of the foundation pit construction, which proved to be successful, are proposed.
机译:武汉地铁2号线(WML2)Li里门站的基坑施工采用明挖法,该隧道位于(已运行)轻轨的桥下。基坑距武汉轻轨1号线(WLRL1)最近的码头仅1.25 m。该项目的安全控制重点在于基坑施工如何影响轻轨桥梁及其操作的安全性。本文利用岩土工程有限差分软件FLAC3D对基坑开挖过程进行了模拟,分析了隔离桩施工,地下连续墙施工以及基坑除水开挖对桥墩的影响。 WLRL1,而有限元软件ANSYS用于模拟WLRL1的数值模型。此外,本文还研究了WML 2的构建方案对WLRL1的运行的影响。最后,根据仿真结果,提出了成功的WLRL1操作安全控制标准和基坑施工安全控制建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号