首页> 外文期刊>International journal of production economics >Applying multi-start simulated annealing to schedule a flowline manufacturing cell with sequence dependent family setup times
【24h】

Applying multi-start simulated annealing to schedule a flowline manufacturing cell with sequence dependent family setup times

机译:应用多起点模拟退火来调度流水线生产单元,其顺序取决于系列建立时间

获取原文
获取原文并翻译 | 示例
           

摘要

Meta-heuristics that attempt to obtain (near) global optimal solutions of NP-hard combinatorial optimization problems generally require diversification to escape from local optimality. One way to achieve diversification is to utilize the multi-start hill climbing strategy. By combining the respective advantages of the multi-start hill climbing strategy and simulated annealing (SA), an effective multi-start simulated annealing (MSA) heuristic is proposed to minimize the makespan for a flowline manufacturing cell scheduling problem with sequence dependent family setup times. The heuristic performance is evaluated by comparing the results achieved by the proposed heuristic with those achieved by the existing meta-heuristics. The computational results show that following multi-start refinement the proposed MSA heuristic is more effective compared to the state-of the-art meta-heuristics on the same benchmark instances.
机译:试图获得(几乎)NP-硬组合优化问题的全局最优解的元启发法通常需要多样化以摆脱局部最优性。实现多元化的一种方法是利用多起点爬山策略。通过结合多起点爬坡策略和模拟退火(SA)各自的优点,提出了一种有效的多起点模拟退火(MSA)启发式算法,以最大程度地减少与序列相关的族设置时间的流水线生产单元调度问题的制造周期。通过比较提议的启发式方法和现有的元启发式方法获得的结果来评估启发式性能。计算结果表明,与相同基准实例上最新的元启发式算法相比,经过多步细化后,拟议的MSA启发式算法更为有效。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号