Reprint of 'Integrating make-to-order and make-to-stock in job shop control'

机译:重印“将按订单生产和按库存生产集成到车间控制中”

获取原文
获取原文并翻译 | 示例
           

摘要

AbstractDemand fluctuations in make-to-order job shops lead to utilisation fluctuations and delivery delays, particularly in periods with high demand. Many job shop production companies therefore include some standardised products in their product mix and use a hybrid make-to-order/ make-to-stock production approach. However, as the control of a make-to-order job shop is usually focused on meeting due dates, which do not apply to make-to-stock items, integrating make-to-stock items in the control of a job shop is not straightforward. We propose four methods of integrating make-to-stock items in the control of a job shop and evaluate these using discrete event simulation in Python. We show that a popular but simple method of always giving priority to MTO items is strongly outperformed by more advanced methods of integrating MTS into job shop control as we have been able to reduce the MTS lost sales by a considerable 60%. We further show that considering up-to-date status information may improve the performance substantially. Loosening the due dates of MTS replenishment orders during periods of low MTS demand enables better use of the production capacity to maximise the delivery performance of MTO instead.HighlightsWe propose four methods of integrating make-to-stock items into job shop control.Shop floor control should consider up-to-date information on inventory levels.Smart integration reduces MTS lost sales by 60% compared to always prioritizing MTO.
机译: 摘要 按订单生产的车间的需求波动会导致利用率波动和交货延迟,尤其是在需求量大的时期。因此,许多车间生产公司在其产品组合中包括一些标准化产品,并采用按订单生产/按库存生产的混合生产方式。但是,由于按订单生产车间的控制通常集中在满足到期日期,而这不适用于按库存生产的物料,因此将按库存生产的物料集成到车间控制中并不是很容易的事情。直截了当。我们提出了四种将按库存生产的物料集成到车间控制中的方法,并使用Python中的离散事件模拟对其进行了评估。我们表明,将MTS集成到作业车间控制中的更先进的方法大大优于总是优先使用MTO项的流行但简单的方法,因为我们已经能够将MTS的销售损失减少60%。我们进一步表明,考虑最新状态信息可能会大大改善性能。在MTS需求较低的时期内,松开MTS补货订单的到期日期可以更好地利用生产能力,从而最大化MTO的交付性能。 突出显示 我们提出了四种将按库存生产的物料集成到车间控制中的方法。 < ce:list-item id =“ u0010”> 车间控制应考虑以下方面的最新信息:库存水平。 聪明地与始终优先考虑MTO相比,整合使MTS的销售损失减少了60%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号