Wind power potential by itself is not a good indicator of the suitability of a region for wind power generation for different purposes. Economic attractiveness is a better indicator in this regard as it stimulates the involvement of private businesses in this sector. Naturally, the shorter is the payback period or the time required to reach profitability, the more attractive will be the project. Considering the high wind energy potential of some regions of Iran, this study evaluates the wind energy available for generating electricity as well as hydrogen by industrial and agricultural sectors in four cities of Ardebil province, namely Ardebil, Khalkhal, Namin, and Meshkinshahr, and then conducts an econometric analysis accordingly. Wind power potentials are evaluated using the energy pattern factor and Weibull distribution function based on 5-year meteorological data of the studied regions. Economic evaluations are performed based on the present worth of incomes and costs, which are estimated for two models of wind turbines with 3.5 and 100 KW rated power. Results indicate that the cities of Namin and Ardebil with wind power densities of respectively 261.68 and 258.99 W/m(2) have the best condition. The economic analysis conducted for turbines shows that for Ardebil, installation of the 3.5 KW and 100 KW turbines will have a payback period of 13 and 5 years, respectively. For Khalkhal, Namin, and Meshkinshahr, the only feasible option is installation of the 100 KW turbine, which would result in a payback period of respectively 10.2, 6.1 and 8.7 years. Then it is investigated how much hydrogen can be gained if these private sectors invest in producing hydrogen using nominated wind turbines. (C) 2019 Hydrogen Energy Publications LLC. Published by Elsevier Ltd. All rights reserved.
机译:风力发电潜力本身并不能很好地表明该地区是否适合不同目的的风力发电。在这方面,经济吸引力是一个较好的指标,因为它会刺激私营企业参与该部门。自然,投资回收期或达到盈利所需的时间越短,该项目就越有吸引力。考虑到伊朗某些地区的高风能潜力,本研究评估了Ardebil省四个城市(即Ardebil,Khalkhal,Namin和Meshkinshahr)的工业和农业部门可用于发电和产生氢气的风能,然后相应地进行计量经济分析。根据研究区域的5年气象数据,使用能量模式因子和威布尔分布函数评估风电潜力。根据收入和成本的当前价值进行经济评估,这是针对两种额定功率分别为3.5和100 KW的风力涡轮机进行的估算。结果表明,风能密度分别为261.68和258.99 W / m(2)的Namin和Ardebil城市为最佳状态。对涡轮机进行的经济分析表明,对于Ardebil,安装3.5 KW和100 KW涡轮机的投资回收期分别为13年和5年。对于Khalkhal,Namin和Meshkinshahr,唯一可行的选择是安装100 KW涡轮机,这将分别产生10.2、6.1和8.7年的投资回收期。然后研究了如果这些私营部门投资使用指定的风力涡轮机生产氢气,可以获取多少氢气。 (C)2019氢能出版物有限公司。由Elsevier Ltd.出版。保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号