Purpose - Under the pressure of environment degradation and energy consumption rises, solar photovoltaic power generation (SPPG) has been seen as a strategic emerging industry in China. However, the SPPG projects have many uncertain factors in the process of the life cycle. The purpose of this paper is to evaluate the investment risk comprehensively. Design/methodology/approach - Specifically, this paper firstly identified the risk factors and consequences of SPPG project investment and constructed the investment risk factor evaluation index system. Secondly, the factor analysis method was used to reveal the key investment risk factors and risk consequences. Then, the research hypotheses and conceptual model were proposed, and the empirical analysis was conducted based on the structural equation model (SEM). Findings - The results showed that the six key risk factors (political, economic, technological, management, market and natural) have a significant impact on the risks during the whole period. The influence degree of risk factors in the operational period is such that market factor> political factor > economic factor > management factor > natural factor > technical factor. In addition, the risk of constructional period has a significant impact during the risk of operational period. Except for natural factors, all risk factors are correlated among the mutual influence relationship of risk factors. Finally, this paper puts forward management implications based on the above conclusions: effectively identify investment risk factors and comprehensively improve risk management ability; (refine the risk factors of SPPG project investment and develop targeted risk prevention and control strategies; define risk management objectives and make relevant strategic plans. Research limitations/implications - Because of the chosen research approach, the research results may lack generalisability. Therefore, researchers are encouraged to test the proposed propositions further. Practical implications - It can also help stakeholders propose risk prevention strategies throughout the entire process, to promote the sustainable development of SPPG projects. Originality/value - This study focuses on the investment risk of SPPG projects, by building an evaluation index system to identify key risk factors, and then establishes a SEM covering constructional period risks and operational period risks to better explore SPPG project risks, in an effort to reveal the mutual influence relationship and influence path of investment risk factors of the projects.
机译:目的 - 根据环境的压力降低和能耗升高,太阳能光伏发电(SPPG)被视为中国的战略新兴产业。然而,SPP项目在生命周期的过程中具有许多不确定因素。本文的目的是全面评估投资风险。设计/方法/方法 - 具体而言,本文首先确定了SPP项目投资的风险因素和后果,构建了投资风险因素评估指标体系。其次,使用因子分析方法揭示关键的投资风险因素和风险后果。然后,提出了研究假设和概念模型,并且基于结构方程模型(SEM)进行了实证分析。结果 - 结果表明,六个关键风险因素(政治,经济,技术,管理,市场和自然)对整个时期的风险产生了重大影响。运营时期风险因素的影响程度是市场因素>政治因素>经济因素>管理因素>自然因素>技术因素。此外,建筑期的风险在运营期的风险期间具有显着影响。除了自然因素外,危险因素的相互影响力之间的所有风险因素都存在相关性。最后,本文提出了基于上述结论的管理影响:有效地识别投资风险因素,全面提高风险管理能力; (优化SPP项目投资的危险因素,制定有针对性的风险预防和控制策略;定义风险管理目标并制定相关的战略计划。研究局限/影响 - 由于所选择的研究方法,研究结果可能缺乏可延不可行性。因此,研究人员被鼓励进一步测试提出的命题。实际意义 - 它还可以帮助利益相关者在整个过程中提出风险预防策略,以促进SPP项目的可持续发展。创意/价值 - 本研究重点介绍SPPG项目的投资风险,通过建立评估指标体系来识别关键风险因素,然后建立扫描界限涵盖建筑期限风险和运营期风险,以更好地探索SPPG项目风险,以揭示相互影响力和影响投资风险因素的影响项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号