首页> 外文期刊>International journal of emergency management >Public health emergency management capacity building in Guinea: 2014-2019
【24h】

Public health emergency management capacity building in Guinea: 2014-2019

机译:几内亚公共卫生应急管理能力建设:2014-2019

获取原文
获取原文并翻译 | 示例
           

摘要

Before the Ebola virus disease (EVD) outbreak of 2014-2016, Guinea did not have an emergency management system in place. During the outbreak, Global Health Security Agenda (GHSA) 2014-2019 funds made it possible to rapidly improve the country's capacity to manage epidemics through the development of public health emergency operation centres (PHEOCs) at the national and district levels. Since the end of the response, the infrastructure, staff, and systems of these PHEOCs have been further reinforced and well-integrated in the daily activities of Guinea's National Agency for Health Security, the entity responsible for the management of epidemics. The development of PHEOCs as emergency management tools for epidemics in Guinea would not have been possible without a strong endorsement within the Ministry of Health. Guinea's PHEOC network is well-positioned to serve as a model of excellence for other Ministries in Guinea and Ministries of Health of other countries of West Africa.
机译:在埃博拉病毒疾病(EVD)爆发到2014-2016之前,几内亚没有紧急管理系统。在爆发期间,全球卫生安全议程(GHSA)2014-2019资金使资金能够通过在国家和地区一级的公共卫生应急行动中心(PHEOC)的发展中迅速提高国家管理流行病的能力。由于响应结束以来,这些Pheocs的基础设施,员工和系统得到了进一步加强和融合在几内亚国家健康保障机构的日常活动中,负责管理流行病管理的实体。 PHEOCS作为几内亚流行病学的应急管理工具的发展将在卫生部内没有强烈的认可。几内亚的PHEOC网络是良好的,作为几内亚几内亚其他部委和西非其他国家的卫生部的卓越模式。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号