首页> 外文期刊>International Construction >PCA demands work restart
【24h】

PCA demands work restart

机译:PCA要求重新启动工作

获取原文
获取原文并翻译 | 示例
           

摘要

The Panama Canal Authority (PCA) demanded that the Grupo Unidos por el Canal (GUPC) consortium restart work on the Panama Canal expansion, after claiming almost all activity had stopped. In January, GUPC - which consists of contractors Sacyr, Impregilo, Jan De Nul and CUSA Urban Construction - threatened to suspend work unless it received a further US$ 1.6 billion in funding to cover cost overruns. During weeks of negotiations, the PCA said production levels had dropped to 25% and almost all activity had now ceased.
机译:巴拿马运河管理局(PCA)要求Grupo Unidos por el Canal(GUPC)财团在声称几乎所有活动都已停止后,重新开始巴拿马运河的扩建工作。 1月,由承包商Sacyr,Impregilo,Jan De Nul和CUSA Urban Construction组成的GUPC威胁要中止工作,除非它再获得16亿美元的资金来弥补成本超支。在数周的谈判中,PCA表示生产水平已降至25%,并且几乎所有活动都已停止。

著录项

  • 来源
    《International Construction》 |2014年第2期|7-7|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号