California utilities, transmission groups spar on long lines coordinating agreement

机译:加州公用事业公司,输电集团争相达成长期协议

获取原文
获取原文并翻译 | 示例
           

摘要

Utilities and transmission interests are locked in a battle overnthe coordination of the operation of three 500 kV lines connectingnCalifornia and Oregon.nAt issue is the latest agreement for the operation and maintenancenof the Pacific AC Intertie and the California OregonnTransmission Project. The PACI, constructed in 1967 and ownednby Pacific Gas and Electric, consists of two parallel 505-mile, 500nkV transmission lines running from southern Oregon to centralnCalifornia. The majority of COTP and related facilities are ownednby the Transmission Agency of Northern California and thenWestern Area Power Administration. PacifiCorps owns a substantialnportion of both projects.
机译:在协调连接加利福尼亚州和俄勒冈州的三条500 kV线路的运行时,公用事业和输电业的利益纠缠在一起。争端是太平洋AC Intertie和加利福尼亚州俄勒冈输电项目的运营和维护的最新协议。 PACI建于1967年,由Pacific Gas and Electric拥有,由两条平行的505英里,500nkV输电线路组成,从俄勒冈州南部到加利福尼亚州中部。 COTP的大部分设施及相关设施归北加州输电局和西部地区电力管理局所有。 PacifiCorps拥有这两个项目的大部分。

著录项

  • 来源
    《Inside FERC》 |2011年第0801期|p.13-14|共2页
  • 作者

    Martin Coyne;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号