...
首页> 外文期刊>Inside FERC >PJM resources significantly exceed winter load;forecast for mild weather hits peak load projection
【24h】

PJM resources significantly exceed winter load;forecast for mild weather hits peak load projection

机译:PJM资源大大超过了冬季负荷;对温和天气的预测达到峰值负荷预测

获取原文
获取原文并翻译 | 示例
           

摘要

The PJM Interconnection’s total resources will exceed expected peakrndemand this winter by almost 46,000 MW, or about 35%, thernindependent system operator reported Thursday.rnPJM expects to have more than 177,600 MW of electric capacityrnresources to handle forecast demand of more than 131,700 MW, whichrnis about 8% less than last winter’s peak demand, which was almostrn143,300 MW.
机译:独立系统运营商周四报道,PJM Interconnection的总资源将比今年冬天的峰值需求超出预期的近46,000 MW,约占35%。rnPJM预计将拥有超过177,600 MW的电力资源,以应对超过131,700 MW的预测需求。比去年冬天的峰值需求量(143,300兆瓦)低8%。

著录项

  • 来源
    《Inside FERC》 |2015年第1116期|18-19|共2页
  • 作者

    Mark Watson;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号